electricity complaints commission electricity complaints commission
electricity and gas complaints commission
 

 

Stakeholder Consultation


This page was last updated: 9 March 2009

The Electricity and Gas Complaints Commission is committed to providing access and transparency to the scheme amendment process for stakeholders of the Scheme.

 

Current Consultation - February 2009

Proposal for further changes to the scheme documents to meet the Achievement Standards set by the Electricity Commission and Gas Industry Company for approval of the EGCC scheme.

The Board of the Electricity and Gas Complaints Council (the Board) and the Electricity and Gas Complaints Commission (the Commission) propose to make changes to the scheme documents to meet the Achievement Standards set by the Electricity Commission and the Gas Industry Co (the regulators) for the approval of a consumer complaint resolution scheme for electricity and gas complaints.

On 20 February 2009, the regulators advised that EGCC has been selected as the preferred consumer complaint resolution scheme for electricity and gas complaints.

The Board and the Commission set up a Working Group to consider the further changes that need to be made to the scheme documents. The members of the Working Group are:

Board members
• Gillian Blythe, Meridian Energy
• Jo McKirdy, Contact Energy
• Nigel Barbour, Powerco
• Viv Wright, Electra

Consumer representatives
• David Russell
• Frances Ah Mu, Wellington Community Law Centre

The Working Group released a Consultation Paper on 24 February 2009 and has requested for all submissions to be received by 5pm on Tuesday 3 March 2009.

You can download the Consultation Paper here.

Consultation paper: Consultation Paper.pdf (PDF)

Additional documents:

Appendix I - Proposed Amendments

Appendix II - Achievement Standards

Appendix III - Diagram of changing Scheme Rules

Appendix IV - Format for submissions

Appendix V - Timetable

You can download a copy of the Constitution and Schedules with the proposed amendments marked up here.

(a) Constitution (with marked up changes)
(b) Schedules (with marked up changes)

 

Submissions Received:

Analysis of Submissions (PDF 2.9 Mb)

Contact Energy (PDF 87 KB)

Federated Farmers (PDF 102 KB)

Meridian Energy (PDF 30 KB)

Orion (PDF 69KB)

Powerco (PDF 723 KB)

Powershop (PDF 203 KB)

Transpower (PDF 555 KB)

Wellington Electricity (PDF 116 KB)

 

Previously consulting on

Proposal for changes to the scheme documents to comply with the proposed scheme requirement from the Electricity Commission and Gas Industry Company for approval of the scheme.

Proposal for changes to the scheme documents.

The Board of the Electricity and Gas Complaints Council (the Board) and the Electricity and Gas Complaints Commission (the Commission) propose to make changes to the scheme documents to:

a) meet the assessment criteria proposed by the Electricity Commission and the Gas Industry Co (the regulators) for the approval of a consumer complaint resolution scheme for electricity and gas complaints

b) implement the recommendations from the Wood Report (recommendations following a review of the efficiency and effectiveness of the Commissioner’s complaint handling process)

c) tidy up the scheme documents and remove redundant clauses.

The Board and the Commission set up a Working Group to consider the changes that need to be made to the scheme documents. The members of the Working Group are:

Board members
• Gillian Blythe, Meridian Energy
• Jo McKirdy, Contact Energy
• Nigel Barbour, Powerco
• Viv Wright, Electra

Consumer representatives
• David Russell
• Frances Ah Mu, Wellington Community Law Centre

The Working Group released a Consultation Paper in July 2008 and submissions closed on 29 August 2008. You can download from the links below the Consultation Paper and the submissions received.

Consultation paper: Consultation Paper.pdf (PDF)

Additional documents:

Appendix 1

Appendix 2

Appendix 3

Appendix 4: Revised Codes with marked up changes

Appendix 4: Revised deed with marked up changes

Appendix 4: Revised DRPs with marked up changes

Appendix 4: Revised TOR with marked up changes

Appendix 4: Revised rules with marked up changes

Appendix 5

Appendix 6


Submissions Received:

Contact Energy (PDF 98 KB)

Energy Online (PDF 93 KB)

Genesis Energy (PDF 64 KB)

Grey Power (PDF 53 KB)

Marlborough Lines (PDF 258 KB)

Meridian Energy (PDF 1 MB)

Mighty River Power (PDF192 KB)

Orion (PDF 46 KB)

Powerco (PDF 338 KB)

The Lines Company (PDF82 KB)

Transpower (PDF 517 KB)

Unison (PDF 125 KB)

Vector (PDF 28 KB)

Wellington Community Law Centre (PDF 164 KB)

The Working Group will review all the submissions received with the confirmed criteria which the regulators released on 4 September 2008. There may be further consultation if the scheme documents need any other changes to meet the regulators’ confirmed criteria. The confirmed criteria can be found
at: http://www.electricitycommission.govt.nz/opdev/retail/consumercomplaints

Please direct any enquiries about submissions or the consultation process to:

Wendy Burke
Electricity and Gas Complaints Commission
PO Box 6144
Wellington

Phone: 04 914 4524
E-mail: w.burke@egcomplaints.co.nz


 

Review of the Electricity Consumer Codes of Practice and the Gas Consumer Code of Practice

The Electricity and Gas Complaints Commission is reviewing the current Electricity and Gas Consumer Codes of Practice.

The Electricity & Gas Complaints Commission has convened a working group whose role is to steer through the review process.

The members of the working group are:

 Kate Henderson NZ Federation of Family Budgeting Services
 Joanne McKirdy Contact Energy; Council Board member
 Catherine McNamara Wellington Community Law Centre
 Kerry Nickels Vector; Council Board member

The working group released a consultation paper titled: Review of the Electricity Consumer Code of Practice and the Gas Consumer Code of Practice October 2007. Submissions closed on 2 November 2007. Click here to download the Consultation Paper.

Consultation paper: Review of the Electricity Consumer Code of Practice and the Gas Consumer Code of Practice October 2007 (PDF)

Submissions Received:

Contact Energy Limited (PDF)

Electricity and Gas Complaints Commissioner (Word Doc)

Energy Online (Word Doc)

Fair Trading Branch of the Commerce Commission (Word Doc)

Federated Farmers of New Zealand (Word Doc)

Gas Industry Company Limited (PDF)

Genesis Energy (Word Doc)

Meridian Energy (PDF)

Mighty River Power (PDF)

Powerco (PDF)

Powershop (PDF)

Orion (PDF)

TrustPower (PDF)

Vector (PDF)

Wellington Community Law Centre (Word Doc)

WEL Networks (PDF)

The independent reviewer will report back to the working group in February 2008. The working group will then consider the reviewer's recommendations. It is anticipated that further consultation with stakeholders on any proposed amendments to the current Codes will take place in April 2008.

Enquiries about submissions or the consultation process should be directed to:

Wendy Burke
Electricity and Gas Complaints Commission
PO Box 6144
Wellington

Phone: 04 914 4524
E-mail: w.burke@egcomplaints.co.nz


 

Proposal to Amend the Scheme to Obtain Approval of the Scheme for Electricity

The Electricity & Gas Complaints Commission intends seeking approval of the Scheme from the Electricity Commission in response to the publication of approval criteria in relation to consumer complaint resolution systems.

The Electricity & Gas Complaints Commission has convened a working group to steer through the constitutional changes required to meet the Electricity Commission approval criteria.

The members of the working group are:

 Peter Spiller Independent Chair, Principal Disputes Tribunal Referee
 Mel Orange Meridian Energy; Council Board member
 Peter Browne The Lines Company, Council Board member
 Pat Hanley Consumer representative; Electricity & Gas Complaints Commission
 Bill Bevan Whitireia Community Law Centre

The working group released a consultation paper titled: Constitutional Changes to the Electricity & Gas Complaints Commissioner Scheme April 2007. Submissions closed on 13 April 2007.

Consultation paper: Constitutional Changes to the Electricity & Gas Complaints Commissioner Scheme April 2007 (PDF)

Submissions Received:

Alpine Energy (PDF)

Contact Energy (PDF)

Federated Farmers (PDF)

Genesis Energy (PDF)

MCA (PDF)

Powerco (PDF)

Roger Donkin (PDF)

Transpower (PDF)

Waipa Networks (PDF)

Wanganui Gas (PDF)

 

The working group has considered the submissions and have set out their responses in the Analysis of Submissions on the Consultation Paper: Constitutional Changes to the Electricity & Gas Complaints Commission Scheme April 2007.

Analysis of Submissions May 2007 (PDF)

The working group will undertake further consultation with stakeholders once the Electricity Commission has finalised its approval method for consumer complaints resolution schemes.

Enquiries about submissions or the consultation process should be directed to:

Electricity and Gas Complaints Commission
PO Box 6144, Wellington
Phone: 0800 22 33 40
E-mail: info@egcomplaints.co.nz


 

web by brazen

Phone: 0800 22 33 40  Fax: 0800 22 33 47
Phone: ++64 4 914 4630 Fax: ++64 4 472 5854

PO Box 5875 Lambton Quay Wellington 6145

electricity complaints commission electricity complaints commission